Portfolio
Work You Can Walk Past in London
Before and After
Camberwell Side Return, SE5
BEFORE
AFTER
Recent Projects
Six Completed Homes
RENOVATION — CAMBERWELL SE5
1st Floor Renovation – Removal of non load bearing walls, creation of a new ensuite, wood engineered flooring and then Painting and decorating throughout
5 Weeks · Completed Aug 2026
Victorian Terrace
Marble Family Bathroom
Mansard Master Suite
Double-Height Kitchen
Client Reviews
What Homeowners Said Afterwards
“They treated the house as if it were their own. The detailing on the new joinery is better than the original, and the quote at the end matched the quote at the start.”
Sarah M. — Camberwell SE5
“Every trade turned up on the day they said they would. With two small children in the house that mattered more than anything else.”
James & Priya T. — Peckham SE15
“We had a modest budget and expected to be talked into spending more. Instead we were told which two things were worth doing properly and which could wait.”
Daniel O. — Brixton SW2
“The loft conversion took fourteen weeks from scaffold to sign-off. The weekly photographs meant we always knew exactly where we were.”
Helen R. — Herne Hill SE24
“Party wall agreements, planning, building control — all of it handled. We signed things and they dealt with the rest.”
Michael A. — Dulwich SE21
“Six months on there is not a single crack or a snag left outstanding. They came back twice to check, unprompted.”
Yemi F. — Forest Hill SE23
Your Project Could Be the Next One Here
Send a few details and we will arrange a free site visit, then a fixed written quotation or estimate.