LC Renovation

Home / Portfolio

Portfolio

Work You Can Walk Past in London

A selection of completed residential projects — loft conversions, home extensions, kitchen and bathroom renovations — with what each one involved and how long it took.

Before and After

Camberwell Side Return, SE5

A dark galley kitchen and an unused three-metre side alley became one twenty-eight square metre kitchen and dining room. Eighteen weeks, including party wall agreements with both neighbours.
Original narrow galley kitchen in a Camberwell terrace before renovation

BEFORE

Completed side return kitchen extension with rooflight and island in Camberwell

AFTER

Recent Projects

Six Completed Homes

Dormer loft conversion bedroom with en suite in Camberwell
LOFT CONVERSION — CAMBERWELL SE5
Rear dormer and hip-to-gable creating two bedrooms and a shower room. New staircase off the existing landing.
14 weeks · completed 2025

RENOVATION — CAMBERWELL SE5

1st Floor Renovation – Removal of non load bearing walls, creation of a new ensuite, wood engineered flooring and then Painting and decorating throughout

5 Weeks · Completed Aug 2026

Restored Victorian living room with original cornice in Dulwich
FULL RENOVATION — DULWICH SE21

Victorian Terrace

Rewired, replumbed and replastered throughout with cornice, sash windows and joinery restored.
26 weeks · completed 2024
Marble family bathroom with walk-in shower in Brixton
BATHROOM RENOVATION — BRIXTON SW2

Marble Family Bathroom

Honed marble slabs, concealed cistern, recessed niches and underfloor heating in a tight footprint.
6 weeks · completed 2024
Mansard loft conversion master suite with dressing room in Herne Hill
LOFT CONVERSION — HERNE HILL SE24

Mansard Master Suite

Full mansard adding a master bedroom, dressing room and shower room across the top floor.
16 weeks · completed 2024
Rear extension kitchen with raised lantern rooflight in Forest Hill
REAR EXTENSION — FOREST HILL SE23

Double-Height Kitchen

Four-metre rear extension with a raised lantern over the dining table and in-frame joinery.
20 weeks · completed 2023

Client Reviews

What Homeowners Said Afterwards

“They treated the house as if it were their own. The detailing on the new joinery is better than the original, and the quote at the end matched the quote at the start.”

Sarah M. — Camberwell SE5

“Every trade turned up on the day they said they would. With two small children in the house that mattered more than anything else.”

James & Priya T. — Peckham SE15

“We had a modest budget and expected to be talked into spending more. Instead we were told which two things were worth doing properly and which could wait.”

Daniel O. — Brixton SW2

“The loft conversion took fourteen weeks from scaffold to sign-off. The weekly photographs meant we always knew exactly where we were.”

Helen R. — Herne Hill SE24

“Party wall agreements, planning, building control — all of it handled. We signed things and they dealt with the rest.”

Michael A. — Dulwich SE21

“Six months on there is not a single crack or a snag left outstanding. They came back twice to check, unprompted.”

Yemi F. — Forest Hill SE23

Your Project Could Be the Next One Here

Send a few details and we will arrange a free site visit, then a fixed written quotation or estimate.

Scroll to Top